  • 9-9-2013 Repair of the stone facade elements
  • 6-9-2013 Start of final floor surface treatments in the common areas
  • 5-9-2013 Installation of new display frames for commercial units and entrance doors to the individual stairwells and theatre
  • 5-9-2013 Repair of the passage walls – imitation stone
  • 3-9-2013 Installation of a new safety railing in front of the main entrance from Dlouhá street
  • 2-9-2013 Opening of a new box office for the Theatre in Dlouhá
  • 1-9-2013 Completion of building façade reconstruction
  • 31-8-2013 Parking stacker installation complete and launch of system testing
  • 30-8-2013 Elevators installed in stairwells B, C and D
  • 20-8-2013 Replacement of all the windows and entrance doors to apartments including the restoration and replicas of original brass ironwork
  • 15-8-2013 Completion of the final plasters in all of the building stairwells
  • 24-7-2013 Fitting of new grilles into the individual passage entrances
  • 15-5-2013 Completion of shell & core of commercial units in the passage
  • 30-4-2013 Completion of construction part of the theatre box office
  • 18-4-2013 Palace Dlouhá opens a show flat

    On wednesday 17 April was held a press conference for the opening of the show flat in the Dlouhá Palace. The show flat presents an opportunity to get a clear idea of the customization and furnishing possibilities. The goal was to restore the architectural quality of the building and to enable the creation of deluxe apartments featuring modern technical equipment and spatial layout.

    It will be our pleasure to present you the project and show flat personally. If interested, you can arrange a meeting with our sales manager on +420 724 720 991.

  • 15-4-2013 Completed plaster wall finishing in stairwell B
  • 15-4-2013 Begun renovation and replacement of windows throughout the building
  • 1-4-2013 Continuous assembly / installation of shop windows in the passage
  • 1-4-2013 Launched implementation of levelling wall finishing in individual flats
  • 1-4-2013 Begun installation of scaffolding for reconstruction of the facade
  • 26-3-2013 SALES POINT WAS MOVED TO THE SHOW FLAT

    Sales point was moved from the street Hradební 1 to the newly opened show flat in Dlouhá Palace. To arrange an individual visit, please call our sales representative at 724 72 09 91.

  • 1-3-2013 Beginning of assembly of parking stackers + completion of cellars; finished core utilities distribution lines
  • 28-2-2013 Passage - complete roofing of exterior of the skylights
  • 21-1-2013 Completion of 2nd phase of construction of parking system

    - Completion of ground works
    - the execution of the main reinforced concrete structure
    - the execution of temporary structures for salvaging floors

  • 14-1-2013 Completion of outpouring of terrazzo in the space of passage
  • 20-12-2012 Completion of elevator shaft in staircase B
  • 18-12-2012 Christmas event

    Christmas event of FIM Group for its business partners and clients as a thank for cooperation and support in 2012. The main program of the evening was the presentation of the Dlouhá Palace and theatre performance of Divadlo Dlouhá ensemble - Three Musketeers.

  • 12-12-2012 A historic roughed stone surface was uncovered with special technology using dry ice
  • 2-11-2012 Palác Dlouhá received two awards in the "Realty project of the year" contest

    On Thursday, 1 November 2012, the results of second annual Realty Project of the Year were announced during the Realty Congress. The Palác Dlouhá residential project, whose developer is the FIM GROUP, won two awards from this competition – The Professional Judges Award and the Public Award for the Realty Project of the Year in Prague 1.

  • 16-10-2012 theatre „Divadlo v Dlouhé“ started to perform in the home scene of Dlouhá Palace
  • 15-10-2012 trial operation of boiler launched
  • 15-9-2012 Completion of terrazzo flooring on stairs

    - Completion of terrazzo flooring on stairs in section C, D and E

  • 31-8-2012 Completion of demolition works in the 2nd phase of site reconstruction

    - Completion of demolition works in the 2nd phase of site reconstruction in section A and B

  • 27-6-2012 Palác Dlouhá was nominated in the "Real Estate Project of the Year 2012"

    You can vote for it and support this unique project.
    http://www.projektroku.cz/detail?86-palac-dlouha

  • 24-5-2012 Spring campaign

    There is a special spring campaign for clients who book their appartments until 21.6.

    For their future appartments in Palace Dlouha building they will be allowed to choose floral decorations together with services by floral designer for 1 year free of charge, up to the amount of CZK 100,000!

  • 1-3-2012 2nd phase of the site reconstruction started

    2nd phase of the site reconstruction works in section A and B started

  • 1-2-2012 We are preparing new showflat for you
  • 30-4-2011 Completion of the 1st phase of the site reconstruction

    Completion of the 1st phase of the site reconstruction - demolition works in section C and D.

  • 1-4-2011 1st phase of the site reconstruction started

    1st phase of the site reconstruction works in section C and D started

  • 1-10-2010 1st phase of the site reconstruction launched

    1st phase of the site reconstruction launched – demolition works in section C and D

  • 29-9-2010 “Certificate” from the authorised inspector

    On 29 September we gained the “Certificate” of the authorised inspector, which states that the construction work described as “Renovation and alteration of the building at Dlouhá street 727/39, Praha 1 – Staré Město” may be carried out to the full extent, on the basis of the documentation supplied for inspection.

  • 2-8-2010 Survey, safety and demolition works

    On 2 August 2010, on the basis of the “Certificate,” we launched the first stage of works – survey, safety and demolition work – in the building.

  • 16-7-2010 “Certificate” from the authorised inspector

    On 16 June 2010 we gained the “Certificate” of the authorised inspector, which states that the construction work described as “Renovation and alteration of the building at Dlouhá street 727/39, Praha 1 – Staré Město, stage 1 – survey, safety and demolition work” may be started on the basis of the documentation supplied for inspection.

  • 1-6-2010 Sales Office

    On 1 June 2010 we opened a new sales office for you, our clients, in the Palác Dlouhá building itself. The entrance is to the immediate right of the (building’s) arcade on Dlouhá street. Our qualified real estate agents are at your service to introduce you to the project and provide you with all the relevant information, from Monday to Friday, 9 am to 6 pm.

  • 4-12-2009 80th anniversary of the theatre in Dlouhá

    On 4 December 2009, the Theatre in Dlouhá Street celebrated its 80th anniversary We took the opportunity to acquaint the public with our Palác Dlouhá project, the aim of which is to renew the original glory of this art deco building, while retaining its original architectural features. We want to return to the building, its original function as a modern urban palace, with a shopping centre on the ground floor and 61 apartments, studios and offices on the upper floors, and a theatre and parking area in the basement.